Backyard ADU at 123 Main St, Sausal Hills — designed and built start to finish by Cresalto Construction.
Dear Mike Smith,
Cresalto Construction proposes the construction of a new detached ADU in the backyard at 123 Main St, Sausal Hills. The new ADU will be located where the detached garage is located and will reuse the existing foundation.
Thank you for inviting us to look at your project. This proposal is meant to do more than put a number in front of you: the pages that follow lay out how we understand the job, exactly what's included, how the investment breaks down trade by trade, the process you can expect, and the people who will be on site and on the phone with you from the first day to the final walkthrough.
Cresalto Construction was founded in 2018 by two builders who had spent years on large projects and kept seeing the same gap: careful work and clear communication rarely came from the same contractor. We built the company to close that gap — a small team, a single point of contact, and a written scope that means what it says.
Every line item here is one we've priced ourselves. If anything is unclear, or you'd like to see a finished job before deciding, call me directly.
We'd be glad to walk through any part of this proposal with you. Whenever you're ready, we are too.
Before you read a single price, here is the project as we understand it. If anything here is not what you had in mind, please tell us and we will fix it.
A sample of custom homes and ADUs build across the Bay Area - the same ground-up, site-specific work your project calls for.
Specialized enough to understand your project. Experienced enough to manage everything around it.
Our work spans ADUs, whole-home remodels, additions, custom homes and multifamily — so we read the whole property, not just the new square footage.
We're glad to arrange a reference call with a recent client, and to walk you through a finished job in person.
One number for the whole job — and the pages before it show exactly where it comes from.
The price holds — the only changes are ones you approve in writing.
Backed by a two year workmanship warranty and a 10 year structural
How allowances work
An allowance is a budget for something you'll choose later — tile, fixtures, appliances. If your selection costs less, you're credited the difference; if it costs more, the difference is billed at cost, never marked up.
How billing works
We bill every two weeks against work actually completed. You'll see a short progress note with each invoice, and nothing is invoiced before it's built.
Carried separately (not in this price)
Every trade in your project, itemized - each line with its price and exactly what it covers. This is the complete scope your contract is built on.
Budgets for the selections you'll make — tile, fixtures, appliances — priced here so the total is complete before you've chosen.
One team, one process, a single point of contact — so you always know what's next and what to expect.
We confirm scope, finalize selections against your allowances, and prepare the project - ordering long-lead items and lining up the trades before work begins.
Once the city approves the permit and the contract is signed, we mobilize. Work substantially commences no later than 14 business days after written approval and signing.
Our team manages trades, schedules inspections, secures the site, and runs the build. You receive a schedule update every two weeks and weekly progress communication.
When the work is substantially complete, we walk the project together and generate a written punch list. We complete every item at no additional cost, with the holdback protecting you until its done.
We finish final inspections, hand off your warranty and lien-release documentation, and make sure the project ends well - with everything the city and you need in hand.
On schedules
We put a start window in writing and update you every two weeks whether or not anything changed. When something does — a permit, a back-ordered window, weather — you hear it from us first, with the new date beside it.
Clients choose Cresalto because we bring structure to projects with a lot of moving parts — and stay in touch the whole way through.
The person who walks the site and writes the scope is the person you call during construction. No hand-off after signing.
Every trade is itemized, allowances are named and priced, and exclusions are written down before you sign — so the number you see is the number you pay.
A start window in writing, a schedule you can see, and an update every two weeks whether or not anything changed.
Framing, concrete and finish carpentry are in-house. Licensed trade partners we've worked with for years handle the rest.
Your warranty, in writing.
Two-year workmanship warranty on all labor and materials we furnish, plus a ten-year structural warranty on foundation and framing. Manufacturer warranties on windows, roofing, appliances and fixtures pass through to you in full.
You'll work with the same two people from the first site walk to the final walkthrough — not a salesperson who hands you off after signing.
Paul runs the front of the business — the first site walk, the scope conversation, the numbers — and stays your point of contact until the punch list is signed off.
Titus runs the field: trades, schedule, inspections, and the daily check that what's being built matches what was drawn.
A progress note every week, a schedule update every two weeks, itemized billing you can read, and change orders in writing before the work — never after. Honest conversations about budget and timeline are the standard, not the exception
They told us the ADU would take five months and it took five months. Every other contractor we talked to hedged; Cresalto put a date in writing and then hit it. Our mother moved in the week after final inspection.
Two-week updates, every two weeks, even when the update was 'nothing changed.' I've never had a contractor do that. The garage conversion looks like it was always part of the house.
The proposal was the first one we could actually read. Every trade had a number next to it, the allowances were spelled out, and nothing showed up later that wasn't on that document.
The fourplex was our first ground-up build as owners and we were nervous about everything. Paul walked us through every decision before it cost money, and the building was rented within a month of certificate of occupancy.
Four simple steps stand between today and the first day of work on your project.
Read through at your convenience, and note anything you'd like us to explain or walk through.
We'll schedule a call to answer questions, refine selections, and confirm the scope and schedule together.
You'll sign our standard construction agreement — a separate document we provide with the final contract — and place the $1,000 deposit to reserve your spot in our schedule and begin pre-construction.
Once the city approves the permit, we mobilize and begin construction within 14 business days — and keep you updated every step.
Have a question before you decide? That's exactly what we're here for.
Once you accept, we'll send the full agreement for you to review and sign — it's a separate document from this proposal.
This just lets us know. Nothing is signed here. We’ll follow up with the agreement and next steps.